Municipal · K-12 · Higher education
We sell one product: the complete six-instrument ensemble, factory direct at USD 9,800 EXW. This page is the short version of what your procurement, risk and finance teams will ask — and what we can actually supply.
Step one
Which route applies depends on your internal threshold and whether the purchase is grant-funded. We quote to fit whichever route you have. Thresholds below are illustrative — your own policy governs.
| Route | When it applies | What we provide |
|---|---|---|
| Micro-purchase card or one-page PO |
Below your agency's small-purchase threshold, which varies by jurisdiction and funding source. | A written quotation with the ex-works price and optional freight scenarios, in USD. Confirm payment method with our finance team before issuing the PO. |
| Formal quote or RFQ 3 bids, sealed or emailed |
Above the small-purchase threshold but below the formal bid limit, or where policy requires competitive quotes. | Line-item pricing, the component schedule and specification text, a delivery schedule, packing list and the document copies we hold. |
| Cooperative contract piggyback / use of contract |
When a cooperative your agency belongs to already holds a competitively awarded contract covering musical or park equipment. | We quote against the co-op line items and supply the contract number for your file. If your co-op is not covered, we will say so rather than guess. |
| Design specification named product |
When a landscape architect specifies the set and the agency buys to the design. | Editable specification text, dimensioned photographs, and the anchoring details for the designer to adapt. |
Step two
Sent on request. Nothing here is conditional on you placing an order, and we do not send documents we do not hold.
A US agency cannot always issue a purchase order to a foreign company without a recognised tax form and bank details. For direct imports we supply a completed W-8BEN-E and our export documents. Please confirm with your accounts payable team which structure their vendor file accepts before the PO is raised — we do not issue a US W-9.
If your risk manager requires a certificate of insurance or comparable project references, tell us the exact form and limits required. We will confirm in writing what we can provide rather than attaching a generic template.
US specifications commonly reference ASTM F1487, F1292, F1951 and the 2010 ADA Standards. We supply project-specific documentation on request; we do not claim a completed third-party ASTM assessment or IPEMA product certification.
Our instruments are made in Guangdong, P.R. China, and are not Buy American / Build America, Buy America Act (BABA) compliant. If your project uses federal funds or an agency-specific domestic-preference clause, check with your grant officer before specifying this product.
We state this plainly rather than let a disclosure failure surface during bid review. For projects where domestic preference does not apply — or where the funding source permits it — we provide the country-of-origin letter and export documents your file needs.
Ex Works, Zhongshan, Guangdong, China (Incoterms 2020). One complete six-instrument set, two plywood export crates, 138 kg net / 260 kg gross. Freight, insurance, duty, customs clearance and installation are not included and are quoted separately for your delivery address.
We design and document with reference to the standards US authorities commonly cite (ASTM F1487, F1292, F1951, 2010 ADA Standards) and supply project-specific documentation on request. We do not hold or claim a completed third-party ASTM assessment or IPEMA product certification. The TÜV / CE documents we hold relate to the EU market.
No. We are a Chinese entity. For direct imports we provide a completed W-8BEN-E and export documents. Confirm with your accounts payable team before raising the PO.
The published USD 9,800 is ex-works Zhongshan, China and does not include freight, insurance, duty or customs clearance. If your solicitation requires a delivered basis, send the delivery address and the Incoterm your purchasing rules require; we will confirm in writing what we can quote before any purchase order is issued. No delivered price is published or implied.
One complete set. Individual components can be quoted separately for a phased project or a replacement.
Either cast-in embedded J-bolt anchors in a new concrete footing, mechanical expansion anchor bolts into an existing cured slab, or a relocatable steel angle plate bolted to a hard surface. Tell us which at quotation stage. See all three methods.
Product, payment, shipping and maintenance questions: read the full buyer FAQ.
Made to your specification
Every set is manufactured to the order, not pulled from a shelf. Beyond the standard ensemble, we adapt the instruments to your site, your age group and your brand:




Send us your site address, delivery port and any specification text. We will return a written quotation, a packing list and the document copies you need.